Hradec substation is a collector substation connecting the 220 kV and 400 kV grid in the Czech Republic's electricity grid. It is situated in Rokle near its local part Hradec in the Ústí nad Labem Region.In Hradec the high voltage transmission lines from the surrounding lignite-fired power stations come together and the distribution of load takes place. Hradec is starting point of two high voltage transmission lines to Germany, a 400 kV line to Röhrsdorf in Saxony and a 400 kV line to Etzenricht in Bavaria. The transmission capacity of the line to Röhrsdorf, which went into service during 1976, is 2640 MW. The 220 kV link to Zwönitz, which was built in the 1950s, no longer exists. There are direct 400 kV interconnections from the substation to Tušimice and Prunéřov power stations.
Source: Wikipedia.org
Droits d'auteur: Creative Commons 3.0
| | Public | allemand
Sélectionnez l'une des activités les plus populaires ci-dessous ou affinez votre recherche
Découvrez les plus beaux et les plus populaires itinéraires du secteur, soigneusement regroupés dans des sélections appropriées.
Source: Zonk43
Droits d'auteur: Creative Commons CC0 1.0
Sélectionnez l'une des catégories les plus populaires ci-dessous ou inspirez-vous de nos sélections
Découvrez les plus beaux et les plus populaires points d'intérêt du secteur, soigneusement regroupés dans des sélections appropriées.
Source: Zonk43
Droits d'auteur: Creative Commons CC0 1.0
Avec RouteYou, vous pouvez facilement créer vos propres cartes personnalisées. Tracez votre itinéraire, ajoutez des points de passage ou des points-nœuds, planifiez des points d'intérêt et des lieux de restauration, et partagez le tout avec votre famille et vos amis.
Planificateur d'itinéraire

<iframe src="https://plugin.routeyou.com/poiviewer/free/?language=fr&params.poi.id=5985956&params.language=en" width="100%" height="600" frameborder="0" allowfullscreen></iframe>
© 2006-2026 RouteYou - www.routeyou.com