The Gotthard Tunnel is a 15,003 m long railway tunnel and forms the summit of the Gotthard Railway in Switzerland. It connects Göschenen with Airolo and was the first tunnel through the Saint-Gotthard Massif in order to bypass the St Gotthard Pass. It was built as single bore tunnel accommodating a standard gauge double-track railway throughout. When opened in 1882, the Gotthard Tunnel was the longest tunnel in the world.
The tunnel rises from the northern portal at Göschenen ) and the highest point ) is reached after approximately 8 kilometres . After two more kilometers, the border between the cantons of Uri and Ticino is passed; after another 5 kilometres , the tunnel ends at the southern portal near to Airolo ). The trip takes about seven to eight minutes by train. Services are operated by the Swiss Federal Railways.
Risorsa: Wikipedia.org
Diritti d'autore: Creative Commons 3.0
| | Pubblica | Francese • Italiano • Olandese • Spagnolo • Tedesco
Airolo, Leventina, Svizzera
Scopri gli itinerari più belli e popolari della zona, accuratamente raggruppati in apposite selezioni.
Risorsa: Fotograf unbekannt
Diritti d'autore: Creative Commons 3.0
Scopri i luoghi di interesse più belli e popolari della zona, accuratamente raggruppati in apposite selezioni.
Risorsa: Fotograf unbekannt
Diritti d'autore: Creative Commons 3.0
Con RouteYou puoi creare facilmente mappe personalizzate. Traccia il tuo itinerario, aggiungi waypoint o nodi, luoghi di interesse e di ristoro, e condividi le mappe con la tua famiglia e i tuoi amici.
Pianificatore di itinerari<iframe src="https://plugin.routeyou.com/poiviewer/free/?language=it&params.poi.id=1618529&params.language=en" width="100%" height="600" frameborder="0" allowfullscreen></iframe>
Prova questa funzionalità gratuitamente con un abbonamento di prova RouteYou Plus.
Se hai già un tale account, accedi ora.
© 2006-2024 RouteYou - www.routeyou.com