GKK Etzenricht, abbreviation for Gleichstromkurzkupplung) Etzenricht, that means Etzenricht HVDC-back-to-back station was an HVDC back-to-back facility near Etzenricht in the district of Neustadt in Bavaria, Germany. It was built up on area of Etzenricht substation, a 380 kV/220 kV/110 kV-substation, which went in service in 1970 and expanded afterwards several times. The operator of this facility, which was used between 1993 and 1995 for exchange of power between Germany and Czech was Bayernwerk AG .
Construction started April 26, 1991 and was completed September 1991. First power was achieved in May 1992 and a powerline to Hradec, Czech was completed September 3, 1992. Trial operation started January 27, 1993 with official opening July 9, 1993. It was shutdown after synchronisation of the German and the Czech Power Grid on October 18, 1995.
Source: Wikipedia.org
Copyright: Creative Commons 3.0
Neustadt an der Waldnaab, Germany
Discover the most beautiful and popular trails in the area, carefully bundled into appropriate selections.
Discover the most beautiful and popular attractions in the area, carefully bundled in appropriate selections.
With RouteYou, it's easy to create your own customised maps. Simply plot your route, add waypoints or nodes, add places of interest and places to eat and drink, and then easily share it with your family and friends.
Route planner<iframe src="https://plugin.routeyou.com/poiviewer/free/?language=en&params.poi.id=2533862" width="100%" height="600" frameborder="0" allowfullscreen></iframe>
Try this feature for free with a RouteYou Plus trial subscription.
If you already have such an account, then log in now.
© 2006-2024 RouteYou - www.routeyou.com