The Dos Valires Tunnel is a major road tunnel in Andorra linking the two upper Andorran parishes of La Massana and Encamp. It is 2.922 kilometres long. The tunnel connects Generals Roads 2 and 3 linking the Valira del Nord and the Valira d'Orient . It is the first stage of the northern bypass of Andorra la Vella/Escaldes-Engordany.
The construction of the tunnel was started in 2005 but was halted in 2009 after one of the viaducts at the La Massana entrance collapsed and killed 5 Portuguese construction workers. The tunnel cost over €160 million to build and it is estimated that 2500 vehicles per day will use the tunnel.
Bron: Wikipedia.org
Auteursrechten: Creative Commons 3.0
| | Publiek | Catalaans • Duits • Frans • Nederlands • Spaans
Adres: Andorra
Statistieken
Selecteer hieronder één van de populairste activiteiten of verfijn je zoekopdracht.
Ontdek de mooiste en meest populaire routes in de buurt, zorgvuldig gebundeld in passende selecties.
Bron: Eric Gaba (Sting - fr:Sting)
Auteursrechten: Creative Commons CC BY-SA 3.0
Selecteer hieronder één van de populairste categorieën of laat je inspireren door onze selecties.
Ontdek de mooiste en meest populaire bezienswaardigheden in de buurt, zorgvuldig gebundeld in passende selecties.
Bron: Eric Gaba (Sting - fr:Sting)
Auteursrechten: Creative Commons CC BY-SA 3.0
Met RouteYou kan je eenvoudig zelf aangepaste kaarten maken. Stippel je route uit, voeg waypoints of knooppunten toe, plan bezienswaardigheden en eet- en drinkgelegenheden in en deel alles met je familie en vrienden.
Routeplanner

<iframe src="https://plugin.routeyou.com/poiviewer/free/?language=nl&params.poi.id=1599815&params.language=en" width="100%" height="600" frameborder="0" allowfullscreen></iframe>
© 2006-2026 RouteYou - www.routeyou.com