Adana Metro is a rail rapid transit system extending 13.5 kilometers along a north–south corridor through Adana, with 13 stations. It can transport 21,600 passengers per hour per direction. The total travel time on the metro, end to end, takes 21 minutes, including all stops.
The rapid transit system for Adana was initiated in 1988 after requests from the mayor Aytaç Durak and the Çukurova University rector Mithat Özsan to the Ministry of Transportation. A feasibility report was completed on May 30, 1990, by the consortium of PMBI A.Ş. and Brinckerkoff Int.Inc. The report was approved by the State Planning Agency and the construction of the rapid transit system was included in the 1993 investment program. In 1996, the project was contracted to Adtranz-Alarko-ABB Electric Consortium for $US 340 million.
Source: Wikipedia.org
Copyright: Creative Commons 3.0
Select one of the most popular activities below or refine your search.
Discover the most beautiful and popular trails in the area, carefully bundled into appropriate selections.
Source: Seyhan668
Copyright: Creative Commons CC BY-SA 3.0
Select one of the most popular categories below or be inspired by our selections.
Discover the most beautiful and popular attractions in the area, carefully bundled in appropriate selections.
Source: Seyhan668
Copyright: Creative Commons CC BY-SA 3.0
With RouteYou, it's easy to create your own customised maps. Simply plot your route, add waypoints or nodes, add places of interest and places to eat and drink, and then easily share it with your family and friends.
Route planner

<iframe src="https://plugin.routeyou.com/poiviewer/free/?language=en&params.poi.id=7926956" width="100%" height="600" frameborder="0" allowfullscreen></iframe>
© 2006-2026 RouteYou - www.routeyou.com